Wade Jackson Obituary,
What Islam Teaches Us About Life,
Articles R
Need quick pricing on Erosion Control Fabric? Where applicable, inspect the footing areas and foundations for evidence of instability or areas where hydrostatic pressures may develop. For maximum effect, both components must be integrally planned prior to road construction. <> endobj Retaining Walls & Slope Stability with a minimum of 50% of the stones . When evidence exists that the foundation depth is inadequate, obtain both the design and hydraulics engineers concurrence with a change order to deepen the foundation. Intermittent inspection of placement of slope protection, slope paving, and fabric operations. 10 0 obj TAR_%R5Wa%*x4ux-x5d1c
iU:v9b!KXGcFK 1fN2 t K! 0000009704 00000 n
Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. 0000004037 00000 n
Type R. Use stones between 50 and 250 lb. Ensure existing shrubs and trees are protected so that they continue to anchor the surrounding soil. Rock riprap consists of loose rock that is dumped on the slope and distributed. The equilibrium soil-to-geotextile system that allows for adequate movement of a liquid across the plane of the geotextile with limited soil loss over the service lifetime of the application. The heavier fabrics provide more strength and are less likely to tear when large class II or Class III boulders are placed on them. Review Section 4-90, Concrete, of this manual for details about concrete production. 0000012187 00000 n
Mirafi 180N is a moderate weight nonwoven geotextile that meets AASHTO M288 Class 1 geotextiles for separation and subsurface drainage. Information reported to the hotline in the past has helped to eliminate certain fraudulent activities and protect State resources. Copies of these details are made available below in both Adobe Portable Document Format(PDF) and AUTOCAD Drawing (DWG) file formats. The best slope protection type for a given situation depends on the conditions where the installation is to be made, availability of protection material, cost of the various types, and protection desired. Mirafi 135N, 140NL and 140NC are lighter weight versions of Mirafi 140N . main search page where you can specify additional parameters. You may check the size of rock by roughly measuring the size and converting the volume to mass. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. 9 0 obj 4 0 obj 0000002044 00000 n
Properly designed and planted vegetative covers play The Standard Specifications provide two methods of placement for this type of protection: Method A and Method B. <>/XObject<>/Properties<>>>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> California Department of Transportation 0000013368 00000 n
Technical Support available for assistance. the contract cost database using the most recent year of data. For measurement and payment, do the following: Chapter 1 - Caltrans Construction Organization, CalOES: Power Outage and Fire Recovery Resources. Decide whether modifications are necessary as a result of changed conditions. Of the various types of instability problems, foundation failures are the most serious and most common. To better control the contractors selection of rocks for placing, ensure the contractor paints tonnage on large rocks used in foundation construction. The contractor must also ensure the construction of adequate returns and keys at the ends. If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. Obtain initial samples and have them tested for the specified attributes. 2, METHOD B) (CY) (ENGMET), ROCK SLOPE PROTECTION (NO. Observe construction to ensure the contractor does the placing, finishing, and curing as specified. Click on the to search for an item in Applicability Rock Slope Armor is applicable to: Slopes where unanticipated flows are encountered. Mirafi N-Series Product Description Sheet. Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. If your 20'x10' patio is to have a 6" base, then you should excavate a total area of 21' (20' +6" +6") by 11' (10' +6" +6"). This information is to be used only as a guide. Values shown are based on Table 873.3A dimensions and an assumed specific gravity of 2.65. Copies of these details are made available below in both Adobe Portable Document Format (PDF) and AUTOCAD Drawing (DWG) file formats. When slope protection is paid by volume, review the plans and quantity calculations in the resident engineers file to determine if there is sufficient detail and accuracy to be used in the project records. construction contract standards page. 0000013346 00000 n
Transportation Specifications Section 96-1.02I for Rock Slope Protection Fabric, Class 8, nonwoven geotextile. Keep records up to date. JavaScript is required to use content on this page. 0000000871 00000 n
Erosion control is an important element of successful slope protection. - Shoreline Protection with EcoTubes&trade; CALTRANS does not have an APL/QPL for fabrics. This section provides guidelines for inspecting slope protection for work specified under Section 72, Slope Protection, of the Standard Specifications. Close observation is required during rock placement to detect any damage to the fabric. There are three material gradation requirements based on required rock layer thicknesses. Click on the product name for a data sheet. endobj K@^9t% OZ$Mb Ne#^/_*Zw;*T_]k. Other Names Rock Slope Protection. The contract will identify the designated method. 0000009975 00000 n
{ , IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN. endobj Slope protection structures are to be used where concentrated water will cause excessive erosion on existing and/or recent cut and fill slopes. TenCate develops and produces materials that function to increase performance, reduce costs and deliver measurable results by working with our customers to provide advanced solutions. (b) Paving fabric specification requires a minimum mass of 4.1 sy/oz. Refer to Section 4-96, Geosynthetics, of this manual for guidelines for inspecting and accepting rock slope protection fabric. 2019-07-30T13:47:33-04:00 RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. The State of Maryland pledges to provide constituents, businesses, customers, and stakeholders with friendly and courteous, timely and responsive, accurate and consistent, accessible and convenient, and truthful and transparent services. Links to important documents and pages can be found below the chart. GHnBc__'h1'u]SO0P+R&yGeJ$FP?cSp28
1}9AQ #T6Bc*)_vU"]T hY# 0000014254 00000 n
. Lap 6'' min. 72-2.02B Fabric Fabric must be RSP fabric that complies with the class shown in the following table: 72-4 SMALL-ROCK SLOPE PROTECTION 72-4.02 MATERIALS In 2007, the FAA approved construction of a new center field taxiway (Taxiway Mike) to alleviate airfield congestion. Graniterock has a 101-year history of providing high quality products and service. Ensure the timber spacers are of the required material and spaced as planned. Enter the item description of the code you wish to search for: XYo[unHCih,(~
t@K{
y.EmvKhy?_\F6.nO?iV5FlD,#t~J7z@Al.z_ooA=H
/$Q-Aav. When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. 7 0 obj rock slope protection (3/8 t, class vi, method b) (ton) 723060 rock slope protection (300 lb, class iv, method b) (cy) . 1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. Contact our sales team at 1-863-270-8118 to discuss your erosion control requirements. When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. US 160NW resists ultraviolet and biological deterioration, rotting, naturally encountered basics and acids. Testing must follow the frequencies shown in Section 6-1, Sample Types and Frequencies, of this manual. 3, METHOD B) (CY), ROCK SLOPE PROTECTION (NO. The latest list of Item Codes is available from HQ Decide whether an adequate number has been provided for the particular installation. 2, METHOD B) (TON) (ENGMET), ROCK SLOPE PROTECTION (NO. item code description; 729012 rock slope protection fabric (class 10) 729011 rock slope protection fabric (class 8) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) If the fabric is joined by stitched seams, stitch with contrasting colored yarn. Protection involves constructing a heavy mass of smaller rocks bound together by concrete. Slope Protection consists of rock, concrete, or concreted rock or slope paving ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE Stability: Angular shapes may be used on any planed slope Durability: Resist degradation and have a durability of 52 minimum (Caltrans) Consistency: Product is the same load after load. Soil Stabilization Matting - Channel Application, Perm. They are designed to protect against raveling-type rockfall that involves small-volume slope failures (up to about 7.6 m3 or 10 yd3) or blocks up to 1.5 m (5 ft), depending on the strength of the mesh used (Muhunthan et al. 2 0 obj FDM 10-10-3 Woven Stabilization and Separation Geotextiles, - Dimensions & Weights for EcoTubes Geotextile Dewatering Tubes, - Dimensions & Weights for EnviroGrid Cellular Confinement, - Material Safety Data Sheet (MSDS) - Drainboard, - Material Safety Data Sheet (MSDS) - Stratagrid, - Material Safety Data Sheet (MSDS) - Envirogrid, - Product Advantages of EcoTubes Geotextile Dewatering Tube, - Product Benefits of EcoTubes Sludge Dewatering Tubes, - Product Benefits of US Fabrics' Foundation Drains, - Product Benefits of US Fabrics' Sheet Drains, Design/Installation Guidelines; Applications, - Comparing Old Style & New Style - Strata Geogrid, - French Drain Exterior Foundation Install, - Geogrid & Welded Wire Form Inside Corner Placement, - Installation Guideline for Separation Heavy Geotextile, - Installation Guideline for Separation Medium Geotextile, - Sheet Drain Exterior Foundation Install, - Theoretical Tube Volumes & Dewatering Capabilities, - Typical Cross Section - Vegetated Reinforced Soil Slope, - Equivalent Products for Composite Drains, - Volumes & Dewatering Capabilities for EcoTubes Geotextile Dewatering Tubes, - Geogrid Quality for Finished Product and Raw Materials, - Use Woven Geotextiles Instead of Geogrids, - Municipal Waste Water & Water Treatment w/ EcoTubes, - SRW (Segmental Retaining Wall) Drainage. %PDF-1.4
%
<>stream Take the following steps when inspecting the work and materials for slope protection: In addition to the general functions discussed above, the following items apply to specific types of slope protection. Mirafi 1100N, 1120N and 1160N are heavy weight nonwoven geotextiles for more severe or extremely harsh conditions, such as rip-rap and revetment applications. Before placement of the broken concrete, inspect the material and be sure the reinforcement has been removed flush to the surface of concrete. Resident engineers should be familiar with the material contained in Chapters 870, Bank ProtectionErosion Control, and 880, "Shore Protection," of the Highway Design Manual. NTPEP Datamine Information: RG80NC is a tracking model number for the following manufacturers products: Mirafi 180NC, SKAPS GE180/GT180C or Propex 861. Erosion Control Blankets Wattles help slow water runoff and reduce soil erosion. The Maryland Department of the Environment (MDE)recentlyadopted the 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control. Refer to Section 6-202, Responsibilities for Acceptance of Manufactured or Fabricated Materials and Products, of this manual for additional information. When rock slope protection fabric is required for either method, ensure the contractor places the fabric before placing the rock slope protection. These supersede the previous Caltrans Riprap Sizes. 2. <>/Metadata 7 0 R/OpenAction 8 0 R/Outlines 110 0 R/PageLayout/SinglePage/PageMode/UseOutlines/Pages 11 0 R/StructTreeRoot 137 0 R/Type/Catalog/ViewerPreferences<>>> At the start of gabion placement, require the contractor to verify the minimum unit weight of the gabions to ensure it meets specifications. When slope protection is paid by weight, refer to the discussion of weighing and metering procedures in Section 3-902E, Weighing Equipment and Procedures, of this manual. 0000005658 00000 n
Civil engineers and landscape architects need proven solutions to control soil erosion, stabilize slopes, enable drainage and create a visually pleasing landscape. At the terminals of protection, ensure the contractor is particularly careful to avoid erosion and undercutting. Chapter 4: Construction Details, Section 72: Slope Protection, Direction of flow and angle of impingement at various water stages, Capability of adjacent soil types to resist erosion from wash and eddy currents. Concrete canvas (CC) has the potential to become a widely used slope protection material owing to advantages such as flexibility, fast construction with low labor costs, and quick strength development. Order corrective work when necessary. uuid:30dd8676-a64b-4579-9ccf-fc82965d356f Method A is used where the stability of the rock slope protection is considerably dependent on the manner in which the individual rocks are placed. Suggested levels of inspection for slope protection activities are: Ensure the contractor is actively performing quality control on placing slope protection and slope paving throughout the operations. /Filter/FlateDecode Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO.